← All guides

Most improved, twice? What really happened in TS1

Our 2026 review said central Middlesbrough "holds its crown for a second year". The headline is true. The full story is better, and in one place it's not the one the headline implies. Here is what the register actually shows.

Field report · October 2026 · Energy Performance of Buildings Register, analysed by North Yield

TS1 homes below EPC C, latest certificate per home at each edition
July 20247,658 homes 63.4%
July 20258,175 homes 58.4%
July 20268,393 homes 55.4%
−8.0 pts
fall in the share of TS1 homes below C in two years
1,032
TS1 homes re-assessed in that time
391
of them crossed from D–G into the A–C band

The claim: top of the table, two years running

We rank postcode districts by how far their share of homes below C fell between editions, counting the 26 districts with at least 2,000 homes on the register. TS1 came first in both years. In the year to July 2025 it fell five points, from 63.4% to 58.4%, well clear of Eaglescliffe in second. In the year to July 2026 it fell another three, to 55.4%, ahead of Redcar & Marske and three Hartlepool districts.

It didn't come from nowhere. In the year before that, TS1 ranked tenth. So "twice in a row" is exactly right, and "three times" would not be.

TS1TS2TS3TS4TS5TS6TS7TS8TS9TS10TS11TS12TS13TS14TS15TS16TS17TS18TS19TS20TS21TS22TS23TS24TS25TS26TS27DL1DL2DL3DL5 TS1TS2TS3TS4TS5
Biggest falls in homes below C, 2024 → 2025
DistrictBeforeAfterChange
TS1 Middlesbrough centre 63.4% 58.4% -5.0 pts
TS16 Eaglescliffe 54.9% 51.1% -3.8 pts
TS6 Eston & South Bank 50.3% 48.1% -2.2 pts
DL2 Darlington rural west 36.1% 33.9% -2.2 pts
TS22 Wynyard & Wolviston 36.5% 34.5% -2.0 pts
Biggest falls in homes below C, 2025 → 2026
DistrictBeforeAfterChange
TS1 Middlesbrough centre 58.4% 55.4% -3.0 pts
TS11 Redcar & Marske 67.3% 64.5% -2.8 pts
TS24 Hartlepool north 45.6% 42.9% -2.7 pts
TS26 Hartlepool west 54.4% 51.6% -2.8 pts
TS25 Hartlepool south 55.3% 52.8% -2.5 pts

The catch: half of the first fall wasn't upgrades

A district's share below C can fall for two reasons. Homes already on the register get re-assessed at a better rating, or homes appear on the register for the first time, already at C or better, and dilute the total. Only the first is improvement.

In the year to July 2025, 517 TS1 homes joined the register, and 82% of them were already at C or above. Some were new builds (111); most had simply never had a certificate before. Together they account for more than half of that year's five-point fall. Re-assessed homes account for 2.2 points. That was still the most of any district, so TS1 earned the first title on upgrades too, but by a smaller margin than the headline suggests.

In the year to July 2026 the picture flips. Re-assessed homes account for 2.3 of TS1's 3.0 points. But on upgrades alone, three Hartlepool districts did slightly more, and TS1 comes fourth. The difference between first and fourth is under half a point, but it's real, and the second "most improved" owes something to the 115 new homes built in TS1 that year.

Where TS1's fall came from, points of the share below C
2024 → 2025−5.0 points in all 2.2 upgrades · 2.7 new to register
2025 → 2026−3.0 points in all 2.3 upgrades · 0.7 new to register
Upgrades only, fall in homes below C from re-assessed homes, 2025 → 2026
DistrictChange
1. TS26 Hartlepool west −2.7 pts
2. TS24 Hartlepool north −2.5 pts
3. TS25 Hartlepool south −2.4 pts
4. TS1 Middlesbrough centre −2.3 pts
5. TS19 Stockton west −1.8 pts

What does stand up: TS1's homes really are improving fastest

Strip out the newcomers and take the long view, and TS1 is still out in front. Across every home in the Tees Valley with more than one certificate, the average gain from first certificate to latest is 4.9 points. In TS1 it's 8.3 points across 4,299 homes, the highest of any district with at least 1,000 re-assessed homes. Darlington's DL3 is next, at 6.9.

Over the last two years, four in five re-assessed TS1 homes came back with a better score, and across all of them the average change was close to nine points. Not every one improved: 180 scored lower. Ratings can fall when an assessor records something an earlier certificate assumed, and the assessment method itself was overhauled in June 2025.

+8.3
average points gained, first to latest certificate, TS1 (4,299 homes)
+4.9
the same figure across the whole Tees Valley
#1
of 23 districts with 1,000+ re-assessed homes
The 1,032 TS1 homes re-assessed, July 2024 – July 2026
  • 822 improved · 79.7%
  • 30 unchanged · 2.9%
  • 180 scored lower · 17.4%

Who did the work: private landlords, re-letting

Over half of the TS1 homes that crossed into C were privately rented: 218 of 391. More than two in three re-assessments were triggered by a new letting, which is the 2030 rental standard doing what it was designed to do. Landlords are upgrading between tenancies and getting a new certificate to prove it. In the year to July 2026, privately rented homes that were re-assessed gained 10.6 points on average, against 7.4 for social housing and 6.6 for owner-occupiers.

Grants played a small but growing part: 39 re-assessments in the latest year were lodged for a grant scheme, up from three the year before.

TS1 homes that crossed into C, by tenure, July 2024 – July 2026
Private rentedof 564 re-assessed 218
Social rentedof 204 re-assessed 97
Owner-occupiedof 245 re-assessed 70

What got done: four-figure jobs, mostly

When a home is re-assessed we compare its new certificate's recommendations with its old one. A measure that was recommended before and has gone now was, in most cases, done. In TS1 the list is led by the cheap and quick: lighting, heating controls and boilers, all jobs a landlord can fit between tenants.

Solar PV is the one to watch. It only cleared on 72 homes, but 57 of them crossed into C, the highest hit rate of any measure. Where a roof suits them, panels are often the single biggest jump on a certificate's list.

Disappearance usually means installed, not always. We leave out solar water heating and wind turbines, which dropped off certificates because of the June 2025 method change, not because anyone fitted them.

Measures that cleared on re-assessment, TS1 homes, July 2024 – July 2026
Low-energy lighting190 crossed into C 443
Heating controls (thermostats & TRVs)188 crossed into C 328
New condensing boiler141 crossed into C 292
Internal or external wall insulation85 crossed into C 157
Floor insulation (all types)76 crossed into C 151
Loft insulation topped up to 270mm50 crossed into C 130
Double glazing46 crossed into C 128
Cavity wall insulation52 crossed into C 124
Solar PV57 crossed into C 72

Street by street

Ayresome Street did more than anywhere else in TS1: 41 homes re-assessed, 24 of them crossing into C. The pattern repeats along the Victorian and Edwardian terraces behind it (Longford, Harford, Meath and Portman Streets), where re-assessed homes gained between six and ten points on average.

Linthorpe Road shows how messy real data is. Eighteen homes crossed into C and only one fell below it, yet more of its re-assessed homes lost points than gained them, and the average change was slightly negative. Nearly all of them are flats on the town's main shopping street, many sitting just either side of the line, where a few points in either direction decide the band.

And the work is far from done. On most of these terraces, seven or eight in ten homes are still below C.

TS1 streets with 15+ re-assessed homes, July 2024 – July 2026
StreetCrossed into CAvg changeStill below C
Ayresome Street41 re-assessed of 158 homes 24 +10.5 71%
Linthorpe Road53 re-assessed of 154 homes · Mostly flats 18 -0.6 43%
Longford Street19 re-assessed of 117 homes 12 +10.3 68%
Harford Street24 re-assessed of 126 homes 11 +7.8 75%
Portman Street32 re-assessed of 135 homes 9 +6.1 84%
Meath Street17 re-assessed of 106 homes 9 +9.2 75%
Crescent Road25 re-assessed of 181 homes 9 +9.5 80%
Albert Terrace18 re-assessed of 110 homes 9 +9.6 30%
Park Road North28 re-assessed of 105 homes 9 +5.3 27%
Gresham Road19 re-assessed of 110 homes 7 +11.7 79%

What's left: the cheap points are going, the walls remain

4,649 TS1 homes are still below C, which is 55.4% of the district. The good news is that 1,263 of them are within five points of the line, a gap that lighting, controls or loft insulation can often close. Low-energy lighting is still on the recommendation list for 1,819 of them.

The harder truth is the housing itself. Two-thirds of TS1 homes are solid-brick, and more than half were built between 1900 and 1929. For 1,831 of the homes below C, the first thing the assessor recommends is internal or external wall insulation, the most expensive job on the list. The next two years in TS1 will be decided by how many of those homes find a cheaper route to C first, and by honest re-assessment after every phase of work.

That's the gap our Retrofit Roadmap is built for: it puts the recommendations in order, prices them, and shows which ones actually get a home to C.

4,649
TS1 homes still below C
1,263
of them within five points of C
66%
of TS1 homes are solid-brick
1,831
below-C homes where wall insulation is the first recommendation

About this analysis

Source: the official Energy Performance of Buildings Register (MHCLG), analysed by North Yield. Each edition takes the latest certificate per property lodged on or before 31 July 2024, 31 July 2025 and 2 July 2026. Rankings cover postcode districts with at least 2,000 homes on the register. "Re-assessed" means a home with an earlier certificate that received a new one in the period. Homes new to the register include new builds and existing homes certificated for the first time. Street figures cover streets with at least 15 re-assessed homes. EPC scores are modelled, not measured. We publish area- and street-level statistics only, never individual addresses.

This piece tests a line from our 2026 review. Where the data tells a more complicated story than a headline, we'd rather publish the complication.

Explore the full interactive survey →

Got a home in TS1 sitting on a D?

391 TS1 homes crossed into C in the last two years. We can tell you where yours stands and the cheapest honest route up. EPCs from £65; a full Retrofit Roadmap is £169.